Monitoring & SCADA
An unmonitored PV plant is a plant quietly losing money. A tripped inverter, a dead string or dirty modules can cut output by double digits without anyone seeing it — unless monitoring tells you in real time. For a commercial plant, monitoring and SCADA aren't an add-on; they're core to protecting ROI.
We install layered monitoring: from inverter and string tracking to plant-level SCADA for MWp-scale installations. All data — production, performance ratio, temperature, alarms — appears on a dashboard accessible from a web portal and an app.
Typical commercial scope
For PV systems 200 kWp and up, we provide string- and inverter-level monitoring; for MWp-scale plants we add SCADA with weather station, energy meter and export control integration.
Components & scope
- Data logger, gateway and multi-brand inverter integration.
- Weather station (irradiance, module temperature) for accurate performance ratio.
- Real-time dashboard, automatic alarms and monthly production reports.
- Export / zero-export control and BESS integration where present.
Who it's for
Any commercial PV owner who wants to be sure their system truly produces to design — and to catch output drops before they become large losses.
Timeline & O&M
Monitoring install usually takes 1–2 weeks. We also offer managed monitoring as part of an O&M contract.
ROI
Monitoring costs little against the production it saves. Catching a single dead inverter early in a week often covers a year of monitoring cost.
Indicative pricing
2026 indicative benchmark:
| System | Type | Indicative price |
|---|---|---|
| Monitoring 200–500 kWp | String + inverter | IDR 25–60 M |
| SCADA 1 MWp+ | + weather station | IDR 80–200 M |
| Managed monitoring | Per month | From IDR 2 M |
Indicative — request the catalog for scope and a project quote.
Monitoring completes every EPC project. We serve plants in Medan, Makassar and Semarang.