☀️ Commercial & Industrial Solar EPC

Commercial & Industrial Solar Panels in Indonesia

We design, supply tier-1 modules, install and handle PLN approval and SLO for factory, warehouse and mall rooftop solar from 200 kWp to 10 MWp under one EPC contract. A 100–500 kWp system is installed in 2–6 weeks after materials arrive, without stopping production. Send 3–6 months of PLN bills and your roof area for a free feasibility study.

☀️ Request Catalog Send PLN Bills via WhatsApp

Tier-1 Modules, Inverters, BESS & Ground-Mount: 200 kWp to 10 MWp

Eight scopes under one EPC contract — from commercial rooftop solar panels and ground-mount plants to batteries, SCADA and O&M after handover.

Rooftop solar EPC from site survey to SLO

One contract and one accountable team from your first PLN bill to a running, handed-over system: bill and load-profile analysis, roof and structural survey, engineering design and yield simulation, procurement of tier-1 modules with a 25-year performance warranty, installation in 2–6 weeks for 100–500 kWp, PLN application, SLO and commissioning, then as-built drawings, warranty documents and monitoring access for your engineers. Typical scale: 200 kWp–2 MWp on factory, warehouse and mall roofs, and 1–10 MWp ground-mounted on factory land.

For system sizes, roof area per kWp and capex vs PPA, see commercial rooftop solar panels in Indonesia; for price per kWp, see our pricing page.

Send 3–6 Months of PLN Bills + Roof Area

From that data we calculate capacity, annual yield and payback — the feasibility study is free, with no obligation.

Request Catalog, Specs & Payback Estimate

Pick a system type, your site location and an approximate capacity — your WhatsApp request is drafted instantly, and our engineering team replies with a product catalog and a payback estimate.

Request a Proposal via WhatsApp

No cost — this button opens WhatsApp with your request. We reply with a catalog, specs and an estimate.

One EPC Contract: Tier-1 Modules, PLN Permits & O&M

Commercial solar is more than mounting panels — ROI is set by sound engineering, quality components and proper O&M across 25 years.

📐

End-to-End Turnkey EPC

Feasibility, design, supply, install, commissioning and PLN permitting — one contract, one accountable partner.

🔋

Tier-1 Components

Tier-1 solar modules and leading inverter and battery brands with valid warranties in Indonesia.

💹

ROI & Payback Focus

Designs optimise self-consumption and performance ratio — 5–8 year payback for the right load profile.

🛰️

Monitoring & O&M

Real-time SCADA, thermal inspection and service contracts keep production maximal across the system life.

Service Areas

Cikarang–Karawang industrial estates, Tangerang–Bekasi logistics, commercial hubs from Surabaya to Makassar — our EPC teams operate across Indonesia.

Factory and warehouse rooftops with commercial solar panels in an Indonesian industrial estate

Guides for Factory Owners and Engineers

All articles →

Commercial Solar — Frequently Asked Questions

How much does a 200 kWp commercial rooftop solar system cost in Indonesia?
As a 2026 benchmark, on-grid rooftop solar of 200–500 kWp runs IDR 10–12 million per kWp installed (IDR 9–11 million for 500 kWp–1 MWp), so a 200 kWp system lands around IDR 2.0–2.4 billion depending on roof type, inverter and install complexity. Per-kWp pricing and battery options are on the pricing page.
What is the payback period for factory solar?
For factories with high daytime consumption, on-grid solar typically pays back in 5–8 years with double-digit IRR, while modules last 25+ years. The drivers are your PLN tariff, load profile and self-consumption ratio.
Do you offer turnkey EPC?
Yes. We handle end-to-end: feasibility study, engineering design, supply of panels-inverters-batteries, structural install, commissioning, PLN permitting and O&M. See EPC services.
Which panel and inverter brands do you use?
We use Tier-1 solar modules and leading inverter and battery brands, selected per project requirements and warranty availability in Indonesia. Final specs follow the feasibility study.
How does net metering and PLN regulation work?
Under ESDM Regulation No. 2/2024, surplus power exported to the grid is no longer credited against the PLN bill for new systems, and rooftop capacity follows PLN quotas. We therefore design for self-consumption or zero-export and check the quota when applying.
Is the feasibility study free?
Yes — we provide an initial estimate of capacity, annual yield and payback free of charge from your roof area and PLN bill. Send the details via WhatsApp or the catalog form.
Which areas do you serve?
We serve industrial and commercial zones in Jakarta, Karawang, Tangerang, Bandung, Surabaya, Bekasi, Cikarang, Semarang, Medan and Makassar. Full list on the coverage page.
Do you provide O&M after installation?
Yes. We offer O&M contracts (module cleaning, thermal inspection, inverter performance monitoring and production reporting) to keep the performance ratio high across the system life.

Send 3–6 Months of PLN Bills + Roof Area → Free Feasibility Study

From that data our engineering team calculates kWp capacity, annual yield, savings and payback for your facility, then surveys the roof and structure. EPC from site survey to SLO under one contract.

Send Your Data via WhatsApp